EnerTek has been hired by a large multinational Engineering Procurement Construction (EPC) contractor to carry out all surface water hydrology and topo-bathymetric studies as part of a ∿132 MW hydroelectric feasibility study in Southern Bolivia. EnerTek has imported a new state of the art equipment to maximise safety, efficiency and data precision. The project includes the installation and maintenance of a network of 9 automatic water level stations and over 26 high precision ground control points.