EnerTek has been hired by a large multinational Engineering Procurement Construction (EPC) contractor to carry out all surface water hydrology and topo-bathymetric studies as part of a ∿132 MW hydroelectric feasibility study in Southern Bolivia. EnerTek have imported new state of the art equipment to maximise safety, efficiency and data precision. The project includes the installation and maintenance of a network of 9 automatic water level stations and over 26 high precision ground control points.